geoSTAND
  • Company
    • Organisation
    • Human Resources
    • Safety at Work
  • Services
    • Geotechnical Investigation
      • Drilling Equipment
      • Crawlers
      • Additional Drilling Equipment
      • In Situ Tests
    • Geotechnical Laboratory
      • Laboratory Equipment
    • Geotechnical Design
      • Software
    • Laboratory Test
      • Soil Mechanics
      • Rock Mechanincs
      • In Situ Tests
      • Aggregates Tests
      • Concrete Tests
      • Asphalt Mix Tests
      • Non Destructive Testing
      • Mobile Labs
  • Projects
  • Clients
  • Quality
  • Contact
  • English
  • Greek
  • German
  • Albanian
Select Page

North Peloponnese Motorway lot 4

In Situ Tests

Geotechnical Investigations for North Peloponnese Motorway lot 4 (APION KLEOS CJV). Execution of 62 core boreholes of 1326m,
39 destructive drillings with parameters recording and execution of pressuremeter tests and 117 trial pits. Completion time of
in situ works 2 months.

P5070004 DSCN1579 DSCN1580

Print Friendly, PDF & Email
Skills

Posted on

26/05/2016

← Peloponnese Motorway Patras – Pyrgos Panagopoula Motorway Tunnel →

Other Projects

  • Trans adriatic pipeline – section Evros – Kavala

  • Attiko Metro – Line 2 “Anthoupoli – Ilion “

  • Geotechnical investigation for the renovation of 7 regional airports

  • Railway Line Evangelismos – Leptokarya

  • Railway Line Inoi -Tihorea

  • Our Group’s companies
  • Loukatos SA
  • Stand SA

© 2026 GEOSTAND S.A. | Powered by INK Design